Wholesale China 120lm/W Street Light Manufacturers – New design Road Project Lighting Led Street Light Outdoor – BETTER LIGHTING

Short Description:


Product Detail

Product Tags

Related Video

Feedback (2)

"Quality to start with, Honesty as base, Sincere company and mutual profit" is our idea, as a way to build constantly and pursue the excellence for Floodlights Led , Led Floodlight 100w , Flood Light Wattage , Accurate process devices, Advanced Injection Molding Equipment, Equipment assembly line, labs and software development are our distinguishing feature.
Wholesale China 120lm/W Street Light Manufacturers – New design Road Project Lighting Led Street Light Outdoor – BETTER LIGHTING Detail:

Product Description

Led Street (4)
products
products
products
products

Product Code

BTLED-1802

Material

Diecasting aluminum

Wattage

A: 60W-120W

B: 20W-60W

C: 10W-40W

LED chip brand

LUMILEDS/CREE/Bridgelux

Driver Brand

MW、PHILIPS、INVENTRONICS、MOSO

Power Factor

>0.95

Voltage Range

90V-305V

Surge Protection

10KV/20KV

Working temprature

-40~60℃

IP rating

IP66

IK rating

≥IK08

Insulation Class

Class I / II

CCT

3000-6500K

Lifetime

50000 hours

Photocell base

with

Packing Size

A: 720x310x170mm

B: 600x290x170mm

C: 400x255x165mm

Installation Spigot

76/60/50mm

Led Street (1)

FAQ

Q1. What about the lead time?

A: Sample needs 5-7 days, mass production time needs 15-20 days for order quantity more than.

Q2. Can I have a sample order for led light?

A: Yes, we welcome sample order to test and check quality. Mixed samples are acceptable.

Q3. What about Payment?

A: Bank Transfer (TT), Paypal, Western Union, Trade assurance; 30% the amount should be paid before producing, the balance 70% of the payment should be paid before shipping.

Q4. How to proceed an order for led light?

A: Firstly let us know your requirements or application. Secondly we quote according to your requirements or our suggestions. Thirdly customer confirms the samples and places deposit for formal order. Fourthly we arrange the production and delivery.

Q5. Is it OK to print my logo on led light product?

A: Yes, it is available to print yout logo on the led light housing.

Q6. How do you ship the goods and how long does it take to arrive?

A: We usually ship by DHL, UPS, FedEx or TNT. It usually takes 5-7 days to arrive. Airline and sea shipping also optional.


Product detail pictures:

Wholesale China 120lm/W Street Light Manufacturers –  New design Road Project Lighting Led Street Light Outdoor  – BETTER LIGHTING detail pictures

Wholesale China 120lm/W Street Light Manufacturers –  New design Road Project Lighting Led Street Light Outdoor  – BETTER LIGHTING detail pictures

Wholesale China 120lm/W Street Light Manufacturers –  New design Road Project Lighting Led Street Light Outdoor  – BETTER LIGHTING detail pictures

Wholesale China 120lm/W Street Light Manufacturers –  New design Road Project Lighting Led Street Light Outdoor  – BETTER LIGHTING detail pictures

Wholesale China 120lm/W Street Light Manufacturers –  New design Road Project Lighting Led Street Light Outdoor  – BETTER LIGHTING detail pictures


Related Product Guide:

That has a sound small business credit, great after-sales service and modern production facilities, we've earned an outstanding standing amid our buyers across the earth for Wholesale China 120lm/W Street Light Manufacturers – New design Road Project Lighting Led Street Light Outdoor – BETTER LIGHTING , The product will supply to all over the world, such as: Hamburg, New Zealand, Munich, We only supply quality items and we believe this is the only way to keep business continue. We can supply custom service too such as Logo, custom size, or custom merchandise etc that can according to customer's requirement.
  • Perfect services, quality products and competitive prices, we have work many times, every time is delighted, wish continue to maintain!
    5 Stars By Julie from Bangladesh - 2017.02.28 14:19
    This company can be well to meet our needs on product quantity and delivery time, so we always choose them when we have procurement requirements.
    5 Stars By Jeff Wolfe from Luxembourg - 2017.05.21 12:31
    Write your message here and send it to us